Day 7 House Assembly (Tuesday, 1/9/18)

The weather cooperated today, with temperatures above freezing and sunny most of the day. We had ice from a little rain and freezing temperatures overnight. The ice had melted by 11am. But for the first few hours, the house subflooring was an ice rink. Everyone was extra careful and we made it through.
The fourth truck arrived today. The ground was still mostly frozen, so there was little chance of getting stuck. It will be different for tomorrow's truck.
Today's truck contained the two big window walls for the water view from the living room and they were quickly lifted into place. We're looking forward to the day when the covers come off those windows. We also have a bundle that contains several of the second floor, driveway side panels. They will get lifted into place tomorrow. It looks like we may have roof panels on Friday, but that may depend on the weather. Rain is forecast to start Thursday night and continue all day Friday, with nearly 1/2 inch forecast for each day. The next two days will be busy.
As before, the time-lapse video is on Vimeo:
Day 7 Time Lapse

Day 7 End of Day