Day 4 House Assembly
Day 4 (Saturday 1/6/18)
Yes, we worked the weekends. The wind abated, but the temperatures are still cold, 10F in the morning when we started. The crane operator was willing to work, so we were making up time we lost when the wind stopped us on Wednesday. We started assembling some timbers today. Many of the wall panels are now installed - we only have a few left. And the trucks that were scheduled to deliver the additional panels were all delayed by the snow storm, especially up in New Hampshire, where the panels are made.
We use wall braces and come-alongs to brace the structure so it doesn't get blown over or fall on someone. It is very interesting to watch and participate in lifting the big floor panels by crane. It sure makes the assembly go quickly. The Lundberg crew, Robert and Kyle, both seem to be enjoying the different construction method.
Here is our progress at the end of the day.
Day 4 End of the Day |